Drain works

In this new house, we were tasked to do a drain system for a full building

First, we started by reading the drawings prepared by the engineer. Next, we did the measurements and made sure that everything corresponds to the drawings. After that, we started to dig drainage trenches and lay down the pipes. We connected all the pipes and created a full drainage system for a full house. An inspector from the city did a ball test, he was very satisfied and accepted our job immediately.